The companies
Picked for RCG's focus: Northwest manufacturers in the middle of a plant launch, line move or ramp-up, where lean layout, flow and standard work have to be built from day one.
1
Janicki Industries
Building a 162,000 sq ft manufacturing facility in Hamilton (350 new jobs), renovating a 40,000 sq ft site in Mount Vernon and expanding in Bellingham, while planning a large new campus in Great Falls, Montana. The company says demand keeps outpacing capacity.
Operations needSeveral sites coming online at once: plant layouts, production flow, standard work and training for hundreds of new hires across aerospace programs.
2
Echodyne
Opened a 40 million dollar radar manufacturing facility built for more than 30,000 radars a year, and is moving all manufacturing out of its headquarters into the new site over the coming months.
Operations needA full production move plus a ramp from low to high volume: line balancing, modular cell design, capacity planning and lean systems for a fast-growing workforce.
3
Schweitzer Engineering Laboratories (SEL)
Investing more than 500 million dollars across new electronic device factories in Moscow, Nampa and Post Falls, Idaho, plus expansions in Washington, Indiana and North Carolina. The Nampa site alone is expected to create about 250 manufacturing careers.
Operations needStanding up several greenfield plants on the same timeline: facility layout, process design, production readiness and consistent standards across sites.
4
JTS (Johnson Thermal Systems)
A Mission Critical Group company that invested 55 million dollars in a new Nampa manufacturing facility, creating 140 jobs and doubling its production capacity.
Operations needDoubling output on large, engineered-to-order products: work-cell design, material flow, throughput and onboarding for a much bigger floor team.
5
Lexington Manufacturing
Took over a long-running fenestration plant in Prineville with 7 lamination lines, 4 profile wrappers and 2 mould lines, and is bringing it back into production with about 50 new employees.
Operations needRestarting a huge plant with a new team: line restarts, layout changes, standard work and lean practices to bring an older facility up to speed.
6
AMI Metals
A Reliance Steel & Aluminum subsidiary building a new 101,000 sq ft site on 12 acres to grow its aluminum plate processing, with cutting, machining and distribution under one roof.
Operations needMoving into a bigger combined manufacturing and distribution site: flow between cutting, machining and shipping, inventory and lead-time reduction.
7
LaFarge & Egge
Moved into a new Everett manufacturing facility, partly funded by a state Evergreen Manufacturing Growth Grant, with staff expected to nearly double to about 60 as production grows.
Operations needA smaller shop scaling fast: shop-floor layout, scheduling, quality systems and lean basics for a team that is twice the size it was.
Based on public company announcements and news coverage through November 2026.
Want intros to companies like these?
Every month we come across manufacturers that need lean, operations and engineering support. We'd like to send those introductions straight to RCG Strategies.